Square Tube Hollow Bar / Galvanized Square Tubing / Square Tubing

FOB Reference Price:Get Latest Price
$800.00 - $1,000.00 / Tons | 20 Ton/Tons (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Standard:
BS, JIS, GB, DIN, ASTM
Standard2:
BS 1387, BS EN10025, JIS G3445-2006, JIS G3446-2004, GB 5310-1995, GB/T 3091-2001, GB/T3901, GB/T9711, DIN 1626, ASTM A106-2006
Grade Group:
10#-45#, Q195-Q345
Grade:
10#, 20#, 45#, Q235, Q345, Q195, Q215
Thickness:
0.5 - 30 mm
Section Shape:
Square
Outer Diameter:
10*10mm-600*600mm
Place of Origin:
Tianjin, China
Application:
Structure Pipe
Technique:
ERW
Certification:
CE
Surface Treatment:
Galvanized
Special Pipe:
Thick Wall Pipe
Alloy Or Not:
Non-alloy
Secondary Or Not:
Non-secondary
Type:
Welded
Stock:
Large inventory
Length:
2-12m
MQQ:
20 ton
Zinc coated:
60-150g/m2
Supply Ability
Supply Ability:
10000 Ton/Tons per Month
Packaging & Delivery
Packaging Details
Uniform packing or as per customer's requirements.
Port
Tianjin Xingang port

 

Product Description

 

Commodity

  Rectangular Steel Pipe 

Outer diameter

10*10-600*600mm

Wall thickness

0.5-30mm

Length

2m--5.8m/6m/12m and RANDOM LENGTH

Standard

BS 1387 BS EN10296 BS 4568 BS 4568 BS 1139

 JIS G3463-2006 GB 3087-1999 GB/T 3091-2001

 DIN 1626 DIN 2444 ASTM A53-2007

Grade

Chinese Grade

Q215 Q235 According to GB/T700;

Q345 According to GB/T1591

Foreign Grade

ASTM

A53, Grade B, Grade C,

 Grade D, Grade 50

EN

S185,S235JR,S235JO

E335,S355JR,S355J2

JIS

SS330,SS400,SPFC590

Zinc coating

Pre galvanized steel pipe: 60-150g/m2;

Hot dipped galvanized steel pipe: 200-550g/m2

Surface

Bared, Galvanized, Oiled, Color Paint, 3PE; 

Or Other Anti-corrosive Treatment

Inspection

With Chemical Composition and 

Mechanical Properties Analysis;

Dimensional and Visual Inspection, Also 

With Nondestructive Inspection.

Usage

Scaffolding pipe, Structure pipe, Fence/Door 

pipe, Furniture, Low pressure fluid

 pipe for water oil or gas, Boiler pipe.

main market

Middle East,Africa, Asia and some

 European country and America ,Australia

Packing

1.bundle

2.in bulk

3.plastic bags

4.according to

client's requirement

Delivery time

10-15 days after the order.

Payment Terms

1.T/T: 30% T/T advance,

 70% balance copy of B/L

2.L/C: at sight

3.T/T and L/C: 40% 

T/T advance, 60% L/C

4.Western Union

Port

Tianjin Port

Others

1.Special design available

 according to requirement

2.Pipe can be necked down,

 punching hole on pipe wall.

3.Pipe fittings,

elbows are available.

 

 

 

Contact us

 

We are grateful for your trust, and willing to learn what you need.